THE Metropolitan Manila Development Authority (MMDA) has proposed the construction of rainwater impounding facilities inside Camp Aguinaldo to ease recurring flooding on EDSA, with the proposed design released on Wednesday, Aug. 27.
The plan requires detention ponds that will temporarily store excess rainwater during downpours and gradually release it into the EDSA drainage system, leading to the Makiling Creek.
As proposed, the project will be implemented in three phases, covering 182 hectares and involving a golf course near Gate 2, another near Gates 3 and 4, and an open space near Gate 6.

For the first phase near Gate 2, the detention pond has a 361-meter perimeter, a 4,650-square-meter area, an 8-meter depth, and a 37,200-cubic-meter capacity, designed for a 25-year return period (15.6 mm per hour over 24 hours), exceeding the needed 36,945 cubic meters.
MMDA’s schematic shows that under normal weather, the water bypasses the pond and flows through the lagoon to EDSA.
During heavy rain, floodgates divert water flow into the pond; after rain, pumps discharge stored water slowly into EDSA toward the Makiling Creek., This news data comes from:http://www.redcanaco.com
MMDA proposes rainwater facilities in Camp Aguinaldo to mitigate EDSA flooding
The scope of works covers the impounding area, operations and powerhouse, drainage and electromechanical works, and landscaping and golf course restoration, with a treatment facility under consideration.
Officials said operations and maintenance arrangements, and a memorandum of agreement, are still under discussion.
- PH, Australia, Canada hold maritime drills in West Philippine Sea
- Pakistanis no reprieve from floods yet
- Ukraine says Russia linked to lawmaker's killing
- Zelenskyy seeks talks with Trump and European leaders on slow progress of peace efforts with Russia
- Mandela grandson says he will join Gaza aid boat
- Japan accelerates missile deployment amid rising regional tensions
- ‘New NBI chief must be career official’
- Marcos lauds Filipinos for role in nation building on National Heroes Day
- House starts flood control probe
- Sara’s claims that corruption probe could be done in one day 'absolutely preposterous' – Palace